Seneca Gaming – Allegany Casino


Project Description

O V E R V I E W

The Danforth Team returned to Salamanca, NY for Phase V of the Seneca Allegany and Hotel expansion project. The team was awarded the mechanical contract for the project in February 2012.

The project expanded the hotel with an 11-story addition that includes 201 new hotel rooms and 2.5 floors of mechanical and back of house operations space.

A P P R O A C H

Danforth’s responsibilities included HVAC and plumbing system installation. This was accomplished by utilizing Danforth’s in-house capabilities, which facilitated field installation. By making use of both the pipe and sheetmetal fabrication shops, Danforth was able to reduce on-site installation time. Additionally, Danforth installed temperature controls to regulate and monitor the facility.

R E S U L T S

After completion of the work, Danforth performed test and balance work and start-up services to ensure the owner was receiving a quality product.